In 2015, the foundation for a brand-new ice rink in Wesley Chapel, Florida, was just getting started. IC Mechanical was awarded a significant design-build job for this venture to handle all of the structure’s mechanical needs.
Design-Build has been our forte and specialty since we opened in 1995. We had very strict guidelines and a short time frame to complete this project.
Our success in past performances, along with our construction and in-house engineering department, ultimately led to IC Mechanical being awarded this job.
SCOPE
- Aaon chilled water/hot water/energy recovery ventilator (ERV) units
- Temtrol chilled water/hot water air handling units
- Raypak natural gas condensing hydronic boiler
- Exhaust fans
- Variable Air Volume (VAV) boxes
- Domestic water heat exchanger
- Piping, duct work, and air distribution
- Controls
RESULTS
IC Engineering Solutions delivered a cost-effective design that met the unique and demanding requirements for a facility needing very specific temperature and humidity parameters. The mission was completed in 2016, making the rink now the largest facility of its kind in the entire Southeast.